Infrastructure

EAST COAST EXPRESSWAY (LEBUHRAYA PANTAI TIMUR)

East Coast Expressway Phase 2 Package 9B is located in Bukit Bauk Forest Reserve in Dungun, Terengganu. Package 9B is part of a segment Package 9, linking Dungun Interchange to Bukit Besi Interchange. The expressway is designed to 2-lane dual carriageway JKR R6 standard. The length of the package is 5.2km. The alignment traverses through swamps and soft ground area. In deep soft organic soil, elevated structures of 480m and 180m are chosen as the most feasible for geotechnical and animal crossing solution. Between the two structures, Dynamic Replacement method with and without Perforated Vertical Drain (PVD) is used to improve the soft layers below embankment. An overpass is provided for local access to Department of Veterinary Services have been opened to traffic since November 2013.


PULAU SEKATI BRIDGE

Bridge to Pulau Sekati spans across Sungai Terengganu, linking Manir and LPT 2 on the west bank, to Paloh and Losong on the east bank. A dedicated half diamond interchange is provided for access to Pulau Sekati from Paloh and Losong side. The bridge is a 2-lane dual carriageway JKR R5 standard. The main span of the bridge is a box girder with spans of 80m + 120m + 80m, total length of 1060m including precast beams approaches. The bridge is designed for navigational clearance of 8.8m x 100m. The bridge is currently under construction and when completed will be the 2nd longest bridge across Sungai Terengganu.

PASIR MAS BYPASS ROAD

Upgrading exiting heavily trafficked suburban road via a flyover with a new geometry of roundabout and a huge 630m, 14 span of new bridge structure over Sungai Kelantan parallel to existing.


EFFLUENT RECYCLING SEWAGE TREATMENT PLANT IN DESARU

A sewerage treatment plant (STP) will be constructed to cater for the proposed Desaru Pax Project.The total capacity of the plant is 30,000 PE. It will serve the golf course including club house and ancillary buildings, residential units within the golf course development, hotels development and existing establishment that uses the oxidation pond which is going to be decommissioned. The total area required for this STP is 1.53 ha.